A run

BRIDGE DESIGN 2

Tapan Banerjee, P.E. C. Eng., F.I. Struct. E. - Principal/CEO
Dan SenGupta, M.S., P.E. S.E. - Director of Structural Engineering
Arun Gautam, E.I.T., Structural Designer
Wayne Sanders - Sr. CADD Manager
Phil Brown - Sr. Structural CADD Technicia

Multi-Span Bridges in Steel, Concrete and Pre-Stressed Concrete | Alterations/Additions/Strengthening | Seismic Retrofit | Bridge Inspections and Ratings (Fracture-Critical Analysis)

 

Bridge B-21 -- Corps.

Railroad Bridges (4) over re-aligned Blue River,
Kansas City, MO.

Client: Corps of Engineers

 
   

top of page